Bowie State University
IN Mixed Surface Type
Client:
Bowie State University
Location:
Bowie, MD
Size:
1.5 MW Combined
Contractor:
WGL Energy
About Project
SGI installed (4) projects at Bowie State University totaling 1.6MW as electrical contractor for (2) and turnkey contractor on the other (2) projects. This project was completed over the winter of 2017 which presented many challenges, including below freezing temperatures, multiple projects built simultaneously and coordination challenges with school being in session during the builds.