SG Inc. completed a crane pick of Quest Renewable solar trusses on top of Shady Grove parking garage in Rockville, MD. The crane pick required a 9,000 lb lift at a 245’ radius which required a 500 ton crane. The crane was setup between 3AM and 7:30AM and was hook ready by 8:00AM. By 3PM, all (14) trusses were installed.